| |
|
Growth
Management Study
.
Acrobat Reader software is
required
to view linked files
on this page
Many links on
this page open large
PDF files that will be
time consuming
to open.
Reports are available from Planning &
Development and at City libraries.
| 2005 |
|
Pickering Official Plan Amendment OPA 05-002/P
City Initiated: Modified Seaton Plan
Draft Amendment 14
Tabled at the Special Council Meeting of September 6, 2005
118 kb]
September 1, 2005
Report
PD 38-05 (with selected attachments) [PDF 694
kb]
[PDF
875kb]
|
| 2004 |
[PDF 666 kb]
Appendix I to PD 42-04: Draft By-law to Adopt Amendment 13 to the Pickering Official
Plan, for the Seaton Lands only (without Exhibit
"A")
Appendix II to PD 42-04: Draft
By-law to Adopt Amendment 13 to the Pickering Official Plan,
for the Agricultural Assembly lands only (without Exhibit
"A", Amendment 13)
Text of Exhibit "A"
(Amendment 13) to Draft By-laws contained in Appendix I and II
Schedule
'A' to Amendment 13: Land Use Structure
[PDF
1.5 mb]
Schedule
'B' to Amendment 13: Transportation System
[PDF
1.1 mb]
Schedule
'C' to Amendment 13: Brougham
[PDF 47
kb]
Attachment
#1: Context Map
[PDF 128 kb]
Attachment
#2: Text of Information Report PD 15-04
[PDF
118 kb]
Attachment
#3: Statutory Public Meeting Minutes of October 14, 2004
Attachment #4: Pickering Council Resolution #101/04
[PDF
595 kb]
Attachment
#5: Summary of Written Resident/Public Comments
and
Attachments #6 - #22: Resident Comments
[PDF
3.7 mb]
Attachment
#23: Summary of Agency Comments
and
Attachments #24-27: Agency Comments
[PDF
1.1 mb]
|
|
Information
Report 15-04 [PDF
595 kb]
|
[PDF 1.8mb]
On June 29, 2004, Pickering Council
received Report PD 22-04 on Phase 2 of the Growth Management
Study, endorsed a Structure Plan as the basis for preparing
official plan amendments, and authorized staff to commence Phase
3. Phase 3 is the preparation of detailed neighbourhood
plans.
Although a recommended phasing plan
was identified in the Phase 2 Reports, phasing and other
implementation details will be addressed in a subsequent staff
report to Council.
|
- February
2004: Phase 2 Reports available
Bulletin
[PDF 106 kb]
The City's consulting team, led by
Dillon Consulting Limited, has completed the required Phase 2
Reports.
Items 1 and 3 are extremely
large files - there will be a noticeable delay while the documents
load.
-
Phase
2: Preferred Growth Management Concept and Structure Plan
Linked file
is 37mb PDF
Prepared by Dillon Consulting Limited, Sorensen Gravely Lowes
Planning Associates Inc., Joseph Bodgan Associates Inc., and
Enid Slack Consulting Inc. dated February 2004;
Market
Analysis Report
Linked
file is 478kb PDF
Prepared by N. Barry Lyon Consulting
Limited dated January 2004; and
Water
Budget Analysis
Linked
file is 58mb PDF
Prepared by Clarifica Inc. dated November
2003.
|
Executive
Committee endorsed Report PD 11-04, subject to Council’s approval
on March 1, 2004, which in part recommended that Council endorse
for consultation the Phase 2 Reports and direct staff to
circulate the Phase 2 Reports to appropriate agencies and the
public for review and comment.
|
For additional information, please
contact Catherine Rose or Grant McGregor at
905.420.4617.
To
be added to the mailing list, please contact:
Catherine Rose
City of Pickering
Project Manager
By mail: One The Esplanade, Pickering, L1V 6K7
By telephone: 905.420.4660 ext. 2038
By facsimile: 905.420.7648
By email: crose@city.pickering.on.ca
To report broken links,
notify the Website
Coordinator via email.
October 2003:
Design
Workshop |
|
Thank you to everyone who
participated in the City's design workshop held on October 4th,
2003. Close to 20 participants including members of the public,
agencies, landowners, and business operators plus City staff
attended the workshop. There was considerable input provided to the
study team on desirable design aspects for the neighbourhoods, major
centers and corridors, and countryside areas. The study team will
use the comments received as part of the Workshop to create a
detailed land use plan for Phase 2 as well as the neighbourhood
plans that will be developed in Phase 3.
|
|
Phase 2
Booklet: |
|
The Phase 2 Booklet provides a
mechanism for the City of Pickering to collect comments on the
Growth Management Study Phase 2 options.
The Booklet contains
information and questions related to five potential options for
future growth in Pickering. Responses will be used in evaluating
and refining the options, and selecting a "preferred
option" for more detailed planning later in Phase 2.
|
|
Phase 1 Studies: |
|
Phase 1 of the City's Growth
Management Study has been completed. Phase 1 provides valuable
environmental and other background information on the study area
as input to the other phases.
Map
of Study Area Boundary [381kb
PDF]
The three reports produced as part
of Phase 1 are:
- Environmental Systems Analysis
Report and Phase 1 Summary
- Agricultural Community
Assessment
- Background Reports
(Transportation; Water, Wastewater and Stormwater; Population
and Employment; and Parks, Recreation and Greenlands)
Copies of these reports are available for viewing and short term loan
at the Pickering Public Library. They are also available for
viewing at the Planning & Development Counter, and a limited
number of reports will be available for purchase.
Environmental
System Report
Agricultural
Community Assessment Report
Background Report
|
|
Media
Releases: |
June 24, 2003
Phase 2 Open House - Over 100 People Attended
Thank you to everyone who took the
time from his or her busy schedule on a hot evening to attend the
Phase 2 Open House for the City's Growth Management Study. The
Study Team appreciates the challenge in finding time between your
work, family and other interests to get involved in community
issues such as this Study.
The Study Team was able to learn
and better understand the views of many individuals, businesses,
organizations and interest groups.
The comments received will be used
to assist the Consulting Team in evaluating and refining options
and in selecting a preferred growth option for more detailed
planning later in Phase 2.
|
|
Notices: |
|
Meeting
Notes: |
|
March 2004
Bulletin #4
[PDF 106kb]
Release of Phase 2 Reports
June 3, 2003 Bulletin
#3
[PDF 18kb]
Notice of June 24 Public
Open House
March 26, 2003 Bulletin #2
[PDF 27kb]
Notice of April 16
Public Meeting / Open House
March 4, 2003
Bulletin
#1 [PDF
33kb]
Growth Management Study Underway
|
|
March 31, 2003
Environmental
Task Force
[PDF 10 kb]
April 1,
2003
Agricultural
Task Force
[PDF 10 kb]
April 3, 2003
Population
- Employment
[PDF 10 kb]
April 3, 2003
Cultural
Task Force [PDF
10
kb] |
|
|
2002: |
|
On May 21, 2002, Council received
Report Number CAO 05-02 (Revised), which in part authorized the
establishment of a Working Group to assist with the preparation of
draft Terms of Reference for the City’s Growth Management Study.
The Study Area includes the Seaton lands and the Agricultural
Assembly lands. The Study Area boundaries generally follow:
Highway 7 to the north; Sideline 16 and the Pickering - Ajax
boundary to the east; the St. Lawrence & Hudson (formerly the
C.P. Belleville) Rail line to the south; and the Pickering -
Toronto/Markham boundary to the west.
PDF]
Report
to Council, CAO 05-02 [962kb
PDF]
Also on July 29, 2002, Council
confirmed membership on the Working Group. The Working Group
comprised representatives of Council, City staff, the Region of
Durham, the Province of Ontario, the Toronto and Region
Conservation Authority, landowners within the Study Area, and
interested community groups. The Working Group met several times
during October and November, 2002. With the Group's assistance,
draft Terms of Reference have been prepared for the consideration
of Pickering Council.
PDF]
On December 9, 2002, Pickering Council received Report Number
CAO 10-02 concerning the Terms of Reference for the Growth
Management Study. Council also endorsed the draft Terms of
Reference, which were provided as Appendix I to Report Number CAO
10-02, and authorized staff to issue a Request for Proposals.
PDF]
On February 17, 2003, Pickering Council received Report to
Council CAO 02-03, and approved the proposal submitted by Dillon
Consulting Limited, et al. to undertake the Pickering Growth
Management Study.
PDF]
Dillon
Consulting Proposal [1.3mb
PDF]
At the same meeting, Council appointed David Pickles, City
Councillor - Ward 3 to the Study Steering Committee. Councillor
Pickles joins the following other members of the Study Steering
Committee: Mayor Arthurs; the CAO; the Director, Planning &
Development; the Division Head, Corporate Projects & Policy; a
Durham Regional Planning Department representative; a major
landowner representative (for the Agricultural Assembly); and two
citizen representatives.
PDF]
|
|
|
 |