Project Name

Project Description

Project Schedule

Contractor / Consultant

Browning Avenue

Storm sewer replacement and installation of oil grit separator   Survey completed
Detail design being prepared
Liverpool Road


Road reconstruction and storm sewer from Wharf Street to Annland Street; includes nautical streetscaping in boulevard and lighting Summer 2012 Detail design required
Welrus Street
Storm sewer installation, road reconstruction to an urban standard; sidewalk installation Spring 2012 Topographical survey being completed by Omari Mwinyi Surveying
Westshore Boulevard

Road reconstruction from Oklahoma Drive to Sunrise Avenue Summer 2012 Contractor TBD
Detail design required
Wharf Street
Sidewalk construction on north side of Wharf Street Spring 2011 Project completed
Whitevale Bridge Replacement Design & Schedule B, Class EA Spring 2012 SRM Associates

STREET LIGHTING / TRAFFIC SIGNALS

Project Name

Project Description

Project Schedule

Contractor / Consultant

Bay Ridges Phase I Streetlight replacement program in conjunction with Veridian Project TBD 2012 AECOM
Dixie Road Streetlight replacement from Kingston Road to Finch Avenue Spring 2012 Detail design provided by Nexgen Utilities
Granite Court at Sandstone Manor Intersection Pedestrian Signal Fall 2011 Project completed
Squires Beach Road at Clements Road Signalization of intersection at Clements & Squires Beach Road Fall 2012

Region reviewing property requirements

Waterfront Trail Installation of pedestrian lights on the Waterfront Trail along Annland Street Summer 2012

Design completed by Kirkland Engineering; Staff to review


PARKS

Project Name

Project Description

Project Schedule

Contractor / Consultant

East Shore Community Centre Provide a gravel parking lot to north of community centre Fall 2011 Project completed

UPDATED: February 2012

Key Contact Names:
For Direct Access, dial 905.420.4660 plus the 4-digit extension shown below.
Name Title Ext. Email
Richard W. Holborn  Division Head, Engineering Services 2049 rholborn@cityofpickering.com
Darrell Selsky Supervisor, Engineering & Capital Works 2149 dselsky@cityofpickering.com
Kevin Cahill Construction, Coordinator / Inspector 2059 kcahill@cityofpickering.com
Scott Booker Coordinator, Engineering Design & Systems 2074 sbooker@cityofpickering.com
Arnold Mostert Coordinator, Landscape & Parks Development 2143 amostert@cityofpickering.com
 
       
 

Accessible Pickering | Contact Directory | Employment | Events | Forms | Links | Maps | NewsSearch Website | Site Index | Transit

Copyright © 2001-2011, Corporation of The City of Pickering
Thank you for visiting the City of Pickering website, click for home page